Email: alex.lee@hcrailway.com;mark@hcrbridge.com Tel: +603 6732 6300 Language:

NEWS

HOME       NEWS


HCR’S BRIDGE GIRDER ERECTION MACHINE OPERATES FLAWLESSLY FOR A DECADE IN MEXICO

20252003.jpg▶ Engineering Milestone
Since 2014, HCR’s custom-built single-beam girder erection machine has been instrumental for Mexico’s SEPSA, specializing in installing 60-meter I-beams weighing 130 tons. A decade later, this machine remains operational and is now preparing for its next project – proving true quality endures.

20252002.jpg▶ Enduring Performance
✅ Unmatched Durability: Despite 10 years of rigorous multi-project use, the machine maintains flawless performance with intact paintwork and smooth operation.
✅ Comprehensive Support: HCR provided 3 months of on-site installation guidance and systematic operator training covering operations, safety, and maintenance.
✅ Client Partnership: SEPSA’s strict maintenance adherence combined with HCR’s robust design maximizes equipment lifespan. As a SEPSA executive confirmed: “This machine remains vital – reliable, efficient, and built to last.”

20252001.jpg▶ Legacy of Excellence
HCR’s commitment reflects in:
• Quality First: Solutions engineered to withstand time and stress
• End-to-End Service: Ensuring seamless adoption from training to support
• Global Trust: Building infrastructure legacies with partners like SEPSA

20252006.jpg

HCR Footer with SVG

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top