Email: alex.lee@hcrailway.com;mark@hcrbridge.com Tel: +603 6732 6300 Language:

NEWS

HOME       NEWS


HCR'S DJ700 ERECTOR COMPLETES 72-SPAN PROJECT 30 DAYS EARLY ON SHANGHAI AIRPORT LINK

006 (2).jpg

China's first new double-track municipal railway co-operated with national railways. Connects Hongqiao Station (Minhang) to Shanghai East Station (Pudong). Total length: 68.6km. Will reduce travel time between two airports from 90 to 40 minutes (opening end-2024). Construction started June 2019.

006 (3).jpg

Key Achievement with DJ700

Oct 17, 2022: Installed final 32m box girder
Section: 72 simply supported spans (2226m total)

Critical Parameters:

  • Girder: 700t capacity, 40m span

  • Extreme Conditions: 27.8‰ gradient, 1000m curve radius

  • Challenges: Construction within Shanghai-Kunming Railway protection zone, high safety risks
    Schedule: Completed in 106 days (30 days ahead of plan)

  • 006 (5).jpg

Equipment Advantages

DJ700 Beam Erector features:
✓ Fast assembly/relocation capabilities
✓ High-level mechanical automation
✓ Adapts to bridge-tunnel links, ramps & tight curves

006 (7).jpg

Strategic Significance

  1. China's first direct air-rail link connecting 2 airports + 3 railway stations

  2. Enhances Yangtze Delta transportation hub connectivity

  3. Supports Shanghai's global city competitiveness and national Yangtze Delta integration strategy

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top