Email: alex.lee@hcrailway.com;mark@hcrbridge.com Tel: +603 6732 6300 Language:

NEWS

HOME       NEWS


DJ1000 SYSTEM COMPLETES 389 GIRDER ERECTIONS IN EXTREME CONDITIONS ON SHENYANG-BAIHE HSR

250503.jpgWe announce the successful installation of 389 × 40-meter box girders for the TJ-8 standard section of the Shenyang-Baihe High-Speed Railway (Jilin segment), utilizing our integrated heavy-lift system:

  • DJ1000 Beam Erector

  • 1000T Straddle Carrier

  • 1000T Girder Transporter

250502.jpgEngineering Breakthroughs
▶ Extreme Temperature Operation:
‣ Sustained performance from -30°C (winter) to +35°C (summer)
‣ Implemented thermal management protocols for hydraulic systems
250501.jpg▶ Long-Distance Transport:
‣ Achieved 30km maximum transport distance per girder
‣ Optimized logistics reducing transit time by 40% vs. industry average

250506.jpgStrategic Impact
Upon completion in 2025, this rail section will:
✓ Reduce Beijing-Changbai Mountain travel to 4 hours (vs. current 12+ hours)
✓ Boost tourism revenue in Northeast China by ¥3.8B/year (Jilin Provincial Gov. estimate)

250504.jpg

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top