Rising 125m beside the congested existing bridge, the new $289 million cable-stayed crossing over the Bago River is transforming connectivity between Thanlyin and Thaketa Township. HCR supplied 8 specialized segment erectors to handle 1,928m of 120-ton concrete segments – critical for accommodating heavy trucks from Yangon’s industrial zones.
Project Impact:
▶2x Traffic Flow: Dual 2-lane carriageways vs. single-lane bottleneck
▶Industrial Priority: Designed for 100-ton truck loads (existing bridge: 40-ton limit)
▶2023 Completion: On track to cut peak delays by 70%
DJ900 Beam Erector, box girder installation, hig
DJ550 Beam Erector, 400m Curve Radius, Urban Rai
1000km/h Flying Train, Low Vacuum Tube Maglev, 5
Contact: Alex Lee Ming Kai
Phone: +603 6732 6300
Tel: +603 6732 6300
Email: alex.lee@hcrailway.com;mark@hcrbridge.com
Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia
We chat