The specialized Starter Hanger for Singapore's Jurong Region Line J115A project has completed factory testing. Designed to address spatial constraints including narrow pier configurations, the equipment facilitates segment installation in limited workspace conditions.
Key features include modular components for adaptable positioning and integrated safety systems. The solution is currently undergoing operational validation for the project's specific requirements.
This development supports efficient construction methodologies for urban rail infrastructure in space-restricted environments.
Starter Hanger, segment installation, Jurong Reg
DJ1000 girder erector, -30C construction equipme
Jiangbei Hanshan, Chaohu-Ma'anshan Railway, box
Contact: Alex Lee Ming Kai
Phone: +603 6732 6300
Tel: +603 6732 6300
Email: alex.lee@hcrailway.com;mark@hcrbridge.com
Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia
We chat