Custom-delivered in 2019 to ASTANA SETIA for the Setiawangsa Pantai Expressway, our 220-Tonne Capacity Double Truss Beam Erector (span: 67 metres) has become a linchpin in Malaysia’s heavy infrastructure development.
Four years post-delivery, this engineering workhorse continues to operate flawlessly across successive national projects. Despite surface wear from 20,000+ operational hours, its core systems maintain peak performance reliability. Currently deployed at Kuala Lumpur’s Brickfield River Crossing (2023), the erector demonstrates unparalleled longevity in challenging environments.
Product Superiority:
▶ Continuous Duty Proof: 4+ years of multi-project service with zero structural refits
▶ Mega-Lift Capability: Industry-maximum 220T lift capacity at full span
▶ Future-Adaptive: Modular design supporting redeployment across expressway/rail/bridge projects
DJ900 Beam Erector, box girder installation, hig
DJ550 Beam Erector, 400m Curve Radius, Urban Rai
1000km/h Flying Train, Low Vacuum Tube Maglev, 5
Contact: Alex Lee Ming Kai
Phone: +603 6732 6300
Tel: +603 6732 6300
Email: alex.lee@hcrailway.com;mark@hcrbridge.com
Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia
We chat