Email: alex.lee@hcrailway.com;mark@hcrbridge.com Tel: +603 6732 6300 Language:

NEWS

HOME       NEWS


HCR SEGMENT LIFTERS POWER BALANCED CANTILEVER CONSTRUCTION ON US BONNER BRIDGE

003 (1).jpg

In the construction of the US Bonner Bridge, HCR's specialized segment lifters enabled precise balanced cantilever erection. Each cantilever comprises 26 precast segments, with the lifters anchored to previously erected segments via post-tensioning bars for millimeter-level control.

003 (2).jpg

Technical Superiority
▶ Self-Anchoring System: Lifters form load-bearing chain with installed segments
▶ Synchronized Progress: 26-segment sequence ensures dual-cantilever balance
▶ Global Compliance: Equipment meets AASHTO construction standards

003 (3).jpg

Structural Symphony
As the final segment locked over Pamlico Sound, this cantilevered marvel - powered by HCR technology - redefined coastal infrastructure.

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top