Email: alex.lee@hcrailway.com;mark@hcrbridge.com Tel: +603 6732 6300 Language:

NEWS

HOME       NEWS


CUSTOMIZED EQUIPMENT FOR MEXICO PROJECT ENTERS FACTORY TESTING PHASE

250702.jpgSpecialized equipment designed for the Mexico project has commenced factory trial assembly at our testing facility. The assembly process follows standardized operating procedures with multi-stage quality control checks.

250703.jpg


250707.jpg


250706.jpgThe DJ50150 Single Beam Erector (rated for 50-meter span, 150-ton capacity girders) successfully underwent:

  • ▶ 1.25× Static Load Test

  • ▶ 1.1× Dynamic Load Test
    with client representatives observing via live video feed. Post-test disassembly has prepared the equipment for imminent shipment to Mexico in 40-foot containers.

250704.jpgThe testing protocol aligns with international equipment certification requirements, contributing to global infrastructure development standards.

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top