Email: alex.lee@hcrailway.com;mark@hcrbridge.com Tel: +603 6732 6300 Language:

NEWS

HOME       NEWS


RTG150 PROVEN FOR HIGH-EFFICIENCY PRECAST OPERATIONS

20252201.jpgThe RTG150 Straddle Carrier, developed by Handan China Railway Bridge Machinery Co., Ltd., has completed comprehensive performance tests, verifying its load-handling capacity, maneuverability, and safety under empty and full-load conditions. This achievement enables deployment in high-speed rail bridge construction and space-limited precast beam yards.

20252203.jpg▶ Testing covered evaluations including:

  • ✅ No-load mobility assessments

  • ✅ Lifting and braking sequences

  • ✅ Lateral travel examinations

  • ✅ Heavy-load operations
    20252202.jpgThe RTG150 executed maneuvers: straight-line travel, cross movement, tight-radius turns, and 360° on-site rotation with consistent motion control.

A specialized team of mechanical and electrical engineers performed inspections of structural assemblies, hooks, wire ropes, safety systems, and brakes to confirm operational reliability.

The RTG150 is designed for precast yards, providing greater flexibility without rail infrastructure. It operates effectively in confined spaces where traditional gantry or mobile cranes are unsuitable.

20252205.jpg▶ Functional Advantages:
• Integrated lifting, moving, and placement
• Rail-free configuration for layout modifications
• 360° rotation capability in restricted areas
• Vertical stacking for space optimization
• Improved visibility and safety mechanisms
• Reduced operational costs and rapid commissioning

HCR maintains its commitment to developing advanced equipment for national infrastructure projects.

20252204.jpg

HCR Footer with SVG

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top