Email: alex.lee@hcrailway.com;mark@hcrbridge.com Tel: +603 6732 6300 Language:

NEWS

HOME       NEWS


TYLC200 GIRDER TRANSPORTER COMPLETES FACTORY TESTING FOR MEXICO PROJECT

The TYLC200 Girder Transporter equipped with an integrated hydraulic support system has completed factory validation for the Mexico project. Key technical advancements include:

250902.jpg

250904.jpg

  1. Integrated Hydraulic Support System

    • Multi-stage telescopic legs enable self-contained girder loading/unloading

    • Eliminates gantry crane dependency in casting yard operations

  2. Operational Process Refinement

    • Centralized control console streamulates transfer sequencing

    • Automated leveling mechanisms maintain stability during loading phases

  3. Adaptive Site Performance

    • Configurable support base accommodates variable yard surfaces

    • Modular design facilitates rapid assembly/disassembly

250906.jpg


250907.jpgThe equipment completed protocol-based verification under simulated tropical conditions, aligning with project-specific operational requirements.

HCR Footer with SVG

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top