Email: alex.lee@hcrailway.com;mark@hcrbridge.com Tel: +603 6732 6300 Language:


ELECTRIC PUMP STATION

Product features: Efficient oil supply, intelligent control, low noise
Main purpose: Provide stable hydraulic power for jacks
Application scenarios: Continuous tensioning operation, high altitude or remote operation
Installation points: Horizontal placement, exhaust before connecting the high-pressure oil pipe, regular maintenance of the filter element

Product Description:

  〓 PRODUCT FEATURES  

Dual pump dual circuit design, adjustable flow rate 0~10L/min, with overload protection function;

The LCD screen displays real-time pressure and flow, and supports wireless remote control operation;

Low-energy motor (3kW), suitable for construction sites without external power supply.

  〓 MAIN PURPOSE  

Provide continuous and stable hydraulic power for multiple jacks to achieve automatic tensioning.

  〓 APPLICATION SCENARIOS  

Multi-hole synchronous tensioning of continuous box beams, prestressed construction of high-altitude cable towers, and reinforcement of tunnel linings.

  〓 INSTALLATION POINTS  

Place in a ventilated and dry place, the oil temperature does not exceed 60℃, and the hydraulic oil is replaced regularly;

The high-pressure hose needs to be fixed to avoid bending, and an emergency stop button is set for remote operation.

施工 25_04_08 04.png施工 25_04_08 05.png施工 25_04_08 07.png施工 25_04_08 06.png

Structural safety

Intelligent tensioning eliminates human errors, ensures uniform distribution of prestress, and prevents bridge cracking and deformation

 

Efficient advancement

Multi-equipment collaboration and automated operation shorten the construction period of large-span, multi-channel bridges.

 

Full-scenario coverage

From coastal corrosive environments to extremely cold plateaus, the equipment can output stably, reducing engineering restrictions.

 

Low maintenance cost

Highly durable materials and processes significantly extend the service life of bridges and reduce later maintenance investment



URBAN ELEVATED ROAD

Lightweight jacks and low-noise pump stations to adapt 

to nighttime construction and narrow space constraints

2525 (1).jpg
2525 (10).jpg

CROSS-SEA BRIDGE

Corrosion-resistant anchor and bellows combination 

to resist high-salt environment

HIGHLAND RAILWAY

Low-temperature electric pump stations and antifreeze 

hydraulic oil for stable operation in extremely 

cold environments

2525 (5).jpg

 


PREVIOUS:BELLOWS NEXT:GROUTING PUMP STATION
Inquiry:

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top