Product features: "Steel rope" twisted from multiple strands of fine steel wire, flexible and high-strength Main purpose: "skeleton" of concrete structure, bearing core tension Application scenarios: bridge main beams, building pillars, large foundations Installation points: Tie firmly, with sufficient thickness of protective layer; Grout protection in time after inserting into the corrugated pipe
〓 PRODUCT FEATURES
Flexible and high strength: multiple thin steel wires are twisted into a strand, which can be bent like a "steel rope" but can withstand great tension.
Special for prestressing: pre-apply tension to make concrete more crack-resistant and durable.
Lightweight and easy to operate: Compared with thick steel bars, it is light in weight and suitable for construction of complex shapes.
〓 MAIN PURPOSE
As the "invisible force" of prestressed concrete, it "tightens" the concrete in advance to enhance its bearing capacity.
〓 APPLICATION SCENARIOS
Long-span structure: main beams of railway overpasses and cross-sea bridges;
Complex construction: urban overpasses, expressways.
〓 INSTALLATION POINTS
Lubrication of bundles: apply special grease before inserting into the corrugated pipe to reduce friction resistance.
Timely grouting: pour cement slurry within 48 hours after tensioning is completed to fill the gap and prevent rust and corrosion.
End protection: After the exposed ends of the strands are locked with anchors, they need to be sealed with concrete to avoid rust.
![]() | ![]() | ![]() | ![]() |
Structural safety Intelligent tensioning eliminates human errors, ensures uniform distribution of prestress, and prevents bridge cracking and deformation
| Efficient advancement Multi-equipment collaboration and automated operation shorten the construction period of large-span, multi-channel bridges.
| Full-scenario coverage From coastal corrosive environments to extremely cold plateaus, the equipment can output stably, reducing engineering restrictions.
| Low maintenance cost Highly durable materials and processes significantly extend the service life of bridges and reduce later maintenance investment |
URBAN ELEVATED ROAD Lightweight jacks and low-noise pump stations to adapt to nighttime construction and narrow space constraints | ![]() |
![]() | CROSS-SEA BRIDGE Corrosion-resistant anchor and bellows combination to resist high-salt environment |
HIGHLAND RAILWAY Low-temperature electric pump stations and antifreeze hydraulic oil for stable operation in extremely cold environments | ![]() |
HSR, 900t girder, girder erecting, girder launch
Our DJ900 Beam Erector and Operation team have a
Handan China Railway Bridge Machinery Co.,Ltd, a
Contact: Alex Lee Ming Kai
Phone: +603 6732 6300
Tel: +603 6732 6300
Email: alex.lee@hcrailway.com;mark@hcrbridge.com
Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia
We chat