BELLOWS

Product features: Good flexibility, anti-leakage, pressure deformation resistance
Main purpose: Prestressed tendon hole forming and protection
Application scenarios: Cast-in-place concrete structure, prefabricated components
Installation points: Accurate positioning, sealed joints to avoid damage during pouring

Product Description:

  〓 PRODUCT FEATURES  

Galvanized steel strip material, ring stiffness ≥8kN/m², compression-resistant and non-flattened tube;

Double-wall corrugated structure, low friction coefficient (μ≤0.25), easy to wear;

Acid and alkali resistant, anti-aging, service life of more than 50 years.

  〓 MAIN PURPOSE  

Provide a hole-making channel for prestressed tendons, and protect steel strands from concrete corrosion

  〓 APPLICATION SCENARIOS  

Curved channels of cast-in-place floor slabs, linear channels of prefabricated segmental bridges, and prestressed systems for nuclear power plant containment.

  〓 INSTALLATION POINTS  

Erect positioning bars according to the design coordinates, with a spacing of ≤0.8m, and the curved sections are densely fixed;

The joints are sealed with special sleeves for hot melt, and direct collision of the vibrator is prohibited when pouring concrete.

施工 25_04_08 04.png施工 25_04_08 05.png施工 25_04_08 07.png施工 25_04_08 06.png

Structural safety

Intelligent tensioning eliminates human errors, ensures uniform distribution of prestress, and prevents bridge cracking and deformation

 

Efficient advancement

Multi-equipment collaboration and automated operation shorten the construction period of large-span, multi-channel bridges.

 

Full-scenario coverage

From coastal corrosive environments to extremely cold plateaus, the equipment can output stably, reducing engineering restrictions.

 

Low maintenance cost

Highly durable materials and processes significantly extend the service life of bridges and reduce later maintenance investment



URBAN ELEVATED ROAD

Lightweight jacks and low-noise pump stations to adapt 

to nighttime construction and narrow space constraints

2525 (1).jpg
2525 (10).jpg

CROSS-SEA BRIDGE

Corrosion-resistant anchor and bellows combination 

to resist high-salt environment

HIGHLAND RAILWAY

Low-temperature electric pump stations and antifreeze 

hydraulic oil for stable operation in extremely 

cold environments

2525 (5).jpg

 


PREVIOUS:ANCHOR NEXT:ELECTRIC PUMP STATION
Inquiry:

CATEGORIES

LATEST NEWS

CONTACT US

Contact: Alex Lee Ming Kai

Phone: +603 6732 6300

Tel: +603 6732 6300

Email: alex.lee@hcrailway.com;mark@hcrbridge.com

Add: M1-13-5, 8Trium Tower, Jalan Cempaka SD12/5, Bandar Sri Damansara 52200 Kuala Lumpur, Malaysia

Leave a message

 
Top